Address: 800 Route 146 Bldg. 400, Suite 494 - Clifton Park New York 12065
Phone:518-663-2900
Rochester, NY / Webster, NY
The six story, 126,000 square feet of Class A office building was completed in 2010. The project is certified by the U.S. Green Building Council (USGBC) and with its advanced engineering and energy management technologies will result in the use of far less energy and water than comparable buildings.
SUNY ESF is the nation’s oldest and most distinguished college in the United States focusing on the environment. Campus systems controlled and monitored include a CHP plant with a Biomass Boiler, Micro turbines, and a Steam Turbine. Other systems controlled include Photovoltaic Cell Arrays, Lighting control with interface to HVAC systems, Lab Fume Hood Control, Rainwater Reclamation, Power Monitoring, as well as central station and terminal HVAC equipment.